getaqosa.blogg.se

Utah transit authority schedule
Utah transit authority schedule












It is called The Canyon and was designed by Gordon Huether of Napa, California. The yellow fence was built to have the appearance of a mountain skyline. The work of art for the Airport station is the fence separating the station from the roadway approaching the terminals. Like many other UTA stations, this station has artwork included in its design. As part of the construction of this station a yet-unstaffed Welcome Center was built just inside the entrance from the station to Terminal One, which includes a direct phone line to UTA's customer services and ticket kiosks. Unlike many TRAX stations, Airport does not have a Park and Ride lot. The station is located at 700 North Terminal Drive (immediately south of the east end of Terminal 1), with the island platform extending south from the terminal. Construction started in March 2020 and finished on October 25, 2021.

utah transit authority schedule utah transit authority schedule

Ĭoinciding with the rebuilding of the airport's main terminal building, the station was moved a few hundred feet to the northwest, directly adjacent to the new terminal. The Green Line has service to West Valley City via Downtown Salt Lake City, and connects with the rest of the TRAX system, as well as UTA's FrontRunner commuter rail and S Line streetcar. Airport station is a light rail station located at the Salt Lake City International Airport in Salt Lake City, Utah, serviced by the Green Line of the Utah Transit Authority's (UTA) TRAX system.














Utah transit authority schedule